Plan installation of the ZenseHome Box

By Christian · 27 November 2026

Mounting

An authorised electrical contractor must install the box. Allow six modules in the distribution board, or use an additional board beside it if space is insufficient.

Electrical connections

The 230 V AC supply terminals are N (neutral), L3 (phase 3), L2 (phase 2) and L1 (phase 1). Incorrect connections can damage the system. The manufacturer recommends a dedicated 3P+0 circuit breaker group rated at a maximum of 16 A.

For a single-phase supply, use N and L1.

The connectors on the side of the box are unused and may be inaccessible after installation.

Operating conditions

Install the box where the temperature is 0–30 °C and relative humidity is 20–80%, non-condensing.

Connect the ZenseHome Box to the internet