Plan installation of the ZenseHome Box
By Christian · 27 November 2026
Mounting
An authorised electrical contractor must install the box. Allow six modules in the distribution board, or use an additional board beside it if space is insufficient.
Electrical connections
The 230 V AC supply terminals are N (neutral), L3 (phase 3), L2 (phase 2) and L1 (phase 1). Incorrect connections can damage the system. The manufacturer recommends a dedicated 3P+0 circuit breaker group rated at a maximum of 16 A.
For a single-phase supply, use N and L1.
The connectors on the side of the box are unused and may be inaccessible after installation.
Operating conditions
Install the box where the temperature is 0–30 °C and relative humidity is 20–80%, non-condensing.